These heaps consist of 11 plots every, that are positioned throughout Switzerland. “ corporations are requested to submit their utility paperwork by 12 Could 2024,” the press launch states.
The process is simple: “The heaps will likely be allotted to essentially the most appropriate candidates within the type of a reservation. After signing any reservation settlement for the corresponding lot, a interval of three years will likely be granted for planning the fast-charging hubs and making use of for a constructing allow. Candidates are chargeable for the planning, financing, building, connection, operation and upkeep of the fast-charging hubs.”
It’s not the primary tender of its variety in Switzerland: operators may apply for 5 heaps, every with 20 hubs, till December 2018. In March 2019, FEDRO awarded the contract to 5 corporations, together with GOFAST and Fastned.
Because of the tender, “there’s already a dense community of fast-charging stations on the nationwide roads – each at relaxation areas and repair stations,” in accordance with FEDRO. The brand new tender for 55 places was launched as a result of a “nationwide and usually accessible charging infrastructure” is “important” for the change to electrical automobiles.
On the FEDRO web site, corporations can learn the precise situations of participation and have a look at the info sheets for all 55 plots put out to tender. These comprise not solely key knowledge on the places and knowledge on the situations on web site but additionally a precise delimitation of the plot on a satellite tv for pc picture.
astra.admin.ch (press launch, in German), astra.admin.ch (undertaking web page with particulars, in German)